DROMEC once again supplies winch systems to GS Projects
for Baltic Star

Branche: Marine, Shipbuilding
In Waterhuizen, along the Winschoterdiep, GS Projects builds innovative vessels. For their latest Eco-Freighter 3700, the Baltic Star, commissioned by the Longship Group, DROMEC provided the winch systems.
Anchor winch and capstan
For the Baltic Star, DROMEC supplied a hydraulic anchor winch with a double wildcat for 32 mm anchor chain, including the corresponding chain stoppers. In addition, the vessel is equipped with an electrically driven capstan with a pulling force of 4,100 kg.
The anchor winch was extensively tested at our production facility in Ten Boer and officially approved in the presence of Lloyd’s. Installation then took place during the vessel’s completion in Waterhuizen.
Deep-sea shipping
“With the completion of this 4th vessel for GS Projects, we proudly look back on a successful project. It is a strong vote of confidence that the client has once again chosen our winches. The growing demand in the Northern Netherlands motivates us to continue developing for deep-sea shipping,” says Roelof van Urk, Sales DROMEC.
Dromec Marine
